At Redlands Primary School the requirement was to provide separation for two areas within a sports hall. The opening was 14 metres wide by 3.8 metres high and the Panels needed to stack remotely. Normally a straight forward project but the Finish Specification made it more challenging. Artwork created by the pupils was to be presented on the face of four of the Panels; the theme was the history of the school and surrounding area.
Solution The scheme was to provide Hufcor's Multi-Directional Series 8643 Operable Wall comprising of 12 multi-directional Panels and an Inset Pass Door. The Panels to stack into a remote pocket 4.5 metres from the main track.
The artwork design was provided to us on CD by Nottinghamshire County Council's Design Department and this was then printed onto photographic paper and applied to four of the 3.8 metre long MDF boards. This was finished with a laminating process to provide protection and allow for easy cleaning. Back at Hufcor's Castle Donington factory the boards were incorporated into the Panel construction and subsequently delivered to site and carefully installed along with the remaining eight vinyl covered Panels.
We are pleased to say that the Headmaster Mr Chris Honey, his staff, the children, and everyone connected with the project were delighted with the result!
Read more about Series 8000 Operable wall partitions...
|